Archive for the ‘huge’ Category

Yard Tasks

Sunday, May 27th, 2007

The boat is going into KKMI on tuesday for about a week on the hard. I’m going to try to do as much as possible myself, because my checkbook is trembling in fear.

  • Sand and paint bottom
  • Replace propshaft cutlass bearing
  • Pull mast and inspect mast and hardware
  • Reinforce gooseneck (i.e. throughbolt or backing plate)
  • Quote new standing rigging and replace if appropriate
  • Install backstay insulators
  • Install Orca Green tricolor masthead light
  • Install external forward halyard block, rig messenger
  • Drain the old diesel, replace shutoff valve, replace w/new diesel
  • Fabricate new lifelines

Huge Tasks

Friday, May 18th, 2007

I’ve been actively prepping the boat since late February, so I’ve got lists coming out my proverbial yingyang. Basically, there are two catagories: Huge and Countless.

I’m concentrating particularly on the tasks that are required for the ISAF cat 1 inspection coming up in the beginning/middle of June.

To make myself feel good, I’m going to add a few huge tasks that I’ve already completed, just so I can cross them out.

Huge:

  • Life Raft (bought from Sal’s Inflatables in Alameda)
  • EPIRB (bought through KDP arrived yesterday)
  • Alternate navigation lights + alternate power
  • Emergency Steering
  • Storm sails
  • Heavy weather sail (i.e. #4 jib)
  • Single Sideband Radio (look at used SGC on Monday May 21)
  • Measurement and ORR certification (application + freeboard measurement + sail measurement)
  • Spinnaker net
  • Possible standing rigging replacement