Yard Tasks

The boat is going into KKMI on tuesday for about a week on the hard. I’m going to try to do as much as possible myself, because my checkbook is trembling in fear.

  • Sand and paint bottom
  • Replace propshaft cutlass bearing
  • Pull mast and inspect mast and hardware
  • Reinforce gooseneck (i.e. throughbolt or backing plate)
  • Quote new standing rigging and replace if appropriate
  • Install backstay insulators
  • Install Orca Green tricolor masthead light
  • Install external forward halyard block, rig messenger
  • Drain the old diesel, replace shutoff valve, replace w/new diesel
  • Fabricate new lifelines

Comments are closed.